Root Barrier™ pipe wrap is an evolution from our vertical Root Barrier™ cut off walls. The problem of how to protect services from plants planted very near or directly above the services location. A second consideration is the regular occurrence of roots tracking beside services in the sand bed the pipe is laid on.

Root Barrier™ has developed a simple, economic and practical solution which provides a permanent root proof insulation layer around the service.

Root growth will continue within the services trench, Root Barrier™ pipe wrap process will insulate the service to keep the roots away by providing 100mm thick root proof zone around the service.

Placement of Root Barrier™ pipe wrap is at the time the service is installed in the trench, the simple process is;

1. Excavate the trench 200mm wider than the service.

2. Place Root Barrier in the trench in a U shape, starting 2 metres before the mature tree leaves begin and finish 2metres past the edge of the canopy. (An average tree requires 15 metres).

3. Place 100mm bedding sand inside the Root Barrier in the trench.

4. Install the service as normal.

5. Cover the service with 100mm of sand.

6. Place Root Growth Inhibitor at a rate of 55kg per cubic metre of sand.

7. Fold the Root Barrier flaps over to overlap and cover the top of the sand.

The service, Root Growth Inhibitor and sand are now completely encapsulated within the Root Barrier envelope and cannot leach away or effect the local environment.